Washington Dulles International Airport

Location: Washington, DC (IAD)

Contract Amount: $12 million

ADT performed design, installation and maintenance of all Washington Dulles International Airport security systems including access control, CCTV, digital recording and perimeter security. Major equipment includes Software House access control, American Dynamics CCTV and Loronix digital recording. ADT was also awarded a $1.3 million maintenance contract that runs through June 2006.

Since receiving the maintenance contract for the electronic security systems at the Metropolitan Washington Airports Authority facilities at Dulles and Reagan National airports (see Reagan information below) in 1999, ADT has added more than 250 Software House card readers and field panels to the access control system, in addition to providing all preventive and corrective maintenance on the existing equipment. As part of this contract, 15 ADT technicians were factory-trained and certified on all Software House equipment and software.

ADT has also provided access control, CCTV, digital recording, and other security equipment as a subcontractor to prime construction and electrical contractors at Washington Dulles. ADT provided access control and CCTV system components for a new pedestrian walkback tunnel as a subcontractor to Heller Electric; furnished and installed all security system components for the main terminal renovation as a subcontractor to Centex Construction; and installed access control and CCTV systems as a subcontractor to Turner Construction. The approximate value of these contracts was $ 3.8 million.